Bonding and grounding requirements depend on the specific installation, but standard practice is to bond and ground the metal armor whenever the cable is used outdoors, buried, or enters a building. This assembly does not include a factory-installed ground lead. For grounding, the installer would expose a small section of the armor at an appropriate location, attach an approved bonding/ground clamp, and connect the grounding conductor in accordance with local codes and site standards.